U.S. Northeast Region Case Study
Site information:
- High stormwater runoff concentrations of both suspended and dissolved metals
- Large industrial facility with approx. 40 inches of annual rainfall

3rd Party Testing with stormwater samples:
- Initial RCRA-8 testing to quantify heavy metals in runoff
- Specially designed bench scale testing system used to mimic field MetalZorb catchment system
- CleanWay USA systems tested:
- Geotextile fabric + MetalZorb
- Absorb-it + MetalZorb
- Collection and testing of filtered stormwater over an extended period of time to
confirm filter longevity
Conclusion:
- CleanWay USA products successfully reduced the total suspended solids and dissolved metals to below regulatory limits.